The
demonstration train has the capacity of loading, transporting
and dumping approximately 190 tonnes/hour. The track had eight
drive stations, with each drive acting independently of the
others. Sensors located at each station turned the drives
on as the train arrives and off once the train had passed.
Effectively, up to six additional 51 meter trains could have
been on that track at the same time, each adding an additional
190 tonnes/hour capacity. Six trains could have transported
1140 tonnes/hour.
|